Rail chaos in Saxony: massive restrictions due to construction work!
Construction work between Leipzig and Dresden is causing timetable changes and replacement traffic. Affected travelers should inform themselves.

Rail chaos in Saxony: massive restrictions due to construction work!
Rail travelers in Saxony, Thuringia and Saxony-Anhalt will have to prepare for a bumpy journey in the coming weeks. How MDR reported, extensive construction work is pending, which will significantly affect both long-distance traffic and regional connections. One reason for the disruption is bridge construction work in Thuringia, which begins on Thursday and lasts until mid-July.
The focus is on the routes between Leipzig and Dresden. In particular, the section between Dornreichenbach and Dahlen is completely closed. Replacement traffic will be set up on this and other affected routes, but this could significantly increase travel times. Travelers should be prepared for some trains on the Wiesbaden-Dresden ICE line to start and end from Leipzig, while buses run between Leipzig and Dresden.
Restrictions on long-distance transport
Numerous ICE lines are affected by the construction work, such as the connections via Halle and Erfurt. The IC connections, including Nuremberg-Leipzig and Karlsruhe-Stuttgart-Nuremberg, also have to be rerouted. These diversions could add up to 90 minutes to journey times. Especially on the Hanover-Dresden IC connection, travelers must expect departures every two hours between Leipzig and Dresden, which also stop in Elsterwerda.
The bridge construction work in Thuringia, which will last from the end of June to mid-July, entails additional restrictions. Trains between Leipzig/Halle and Erfurt will be rerouted, extending the journey time between Leipzig and Munich by up to 60 minutes. Here too, direct connections, for example between Frankfurt/Main and Halle (Saale), are no longer available. Travelers are encouraged to find out how in advance via the digital travel information media or the DB Navigator app diethueringer.de notes.
Criticism of alternative transport
The Pro Bahn passenger association is more than dissatisfied with the plans for the replacement service between Leipzig and Dresden. Loud MDR It is criticized that only five articulated buses are provided for replacement transport, which appears to be insufficient in view of the number of passengers. Pro Bahn therefore calls for the measures to be improved and suggests offering direct buses with long-distance transport comfort as a solution.
With this extensive construction work and the resulting changes to the timetable, it is hoped that travelers will be well informed and equipped to reach their destination safely and on time. Anyone traveling on the rails in the Free State should keep an eye on these developments.